Difference between revisions of "Piramal Spinning and Weaving Mill"

From bombaywiki
Jump to: navigation, search
(Created page with "The seven acre mill plot Was bought over by Marathon Developers in the year 2000 and developed into mixed use buildings containing Marathon Era-the residentialtower, Marathon...")
 
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
The seven acre mill plot Was bought over by Marathon Developers in the year 2000 and developed into mixed use buildings containing Marathon Era-the residentialtower, Marathon ERA and Marathon Innova as the commericla wing and IT park.
+
The seven acre mill plot Was bought over by Marathon Developers from Mohal Lal  Piramal in the year 2000 and developed into mixed use buildings containing Marathon Era-the residentialtower, Marathon ERA and Marathon Innova as the commericla wing and IT park.
 +
As part of the Mill land re-development a part of the mill plot has been used for housing the mill workers. A single tower has been constructed containing 236 tenements of the size 225 sq.ft. Out of the total of the 7 acre plot, 1424 sq mts of land has been used for mill workers housing. The lottery for the same was done in the year 2012 and workers shifted there in 2014.

Latest revision as of 16:16, 12 October 2017

The seven acre mill plot Was bought over by Marathon Developers from Mohal Lal Piramal in the year 2000 and developed into mixed use buildings containing Marathon Era-the residentialtower, Marathon ERA and Marathon Innova as the commericla wing and IT park. As part of the Mill land re-development a part of the mill plot has been used for housing the mill workers. A single tower has been constructed containing 236 tenements of the size 225 sq.ft. Out of the total of the 7 acre plot, 1424 sq mts of land has been used for mill workers housing. The lottery for the same was done in the year 2012 and workers shifted there in 2014.